Ventura County Watershed Protection District

 

 

  Please note: this update to the DRAFT web page is under construction.
 

Calleguas Creek Watershed

Happy Camp Canyon Channel Improvement Project Final Mitigated Negative Declaration and Initial Study (December 2006)

Calleguas Creek Watershed Management Plan Study

This webpage provides the design storm peak flows from the existing condition watershed model developed for the Calleguas Creek Watershed Management Plan study.  The model uses the District's VCRAT modified rational method for the peak flow estimation. For an explanation of the model development, please visit the Calleguas Watershed Management Plan Website.

Description Downloadable Link

- General background on the model and an explanation of
how to find your project site design flows

Model Results Procedure
- Areally reduced Calleguas Model results Calleguas Model Results
- Calleguas VCRAT Model Calleguas VCRAT Output
- Areally reduced Revolon Model results Revolon Model Results
- Revolon VCRAT Model output Revolon VCRAT Output
- Army Corps of Engineers Calleguas Creek Feasibility Study (Hydrology Appendix) ACOE 2003 Study Appendix
   
Maps of Model Subareas  
Revolon Calleguas Middle
Calleguas East Calleguas West

If you are unable to find the model results for your project area in the Model Results file, please download and fill out the Data Request Form and e-mail it to: HydroData@ventura.org

 



800 S. Victoria Ave., Ventura, CA 93009-1600
(805) 654-2001 fax (805) 654-3350

You are visitor XXX since XXX.
This page best viewed with 1024 X 768 resolution.
This page last updated on Wednesday, June 20, 2007 .

If you have any questions about this website or would like to report any problems, please contact the Webmaster.